Head Coach Will Bolt, University of Nebraska Baseball Alex Gordon Training Complex at Haymarket Park We have been extremely impressed with our overall experience with Practice Sports. The netting has proven to be durable, the customer service outstanding, and the overall usability of the cages has been top-notch. We have been very happy with how our new indoor facility has turned out, and a big part of that is because of Practice Sports and their dedication to a quality product. — Head Coach Will Bolt, University of Nebraska Baseball About the Project The Alex Gordon Training Complex was completed in the fall of 2011 at a cost of $4.75 million. The facility was specifically designed for baseball and softball and has 18,000 square feet of climate-controlled practice space that allows for working on all phases of the game. The space can be configured to utilize as many as six spacious batting cages. The cages can also be retracted to open up all of the 120-foot by 150-foot space for live game simulation. The entire facility is netted, allowing for the Huskers to take live batting practice. The field turf surface looks and feels like real grass, and the field includes anchors to lock down bases for use during practices.